Problem Statement
As of 17th Feb, 2024 MSFT Fabric Data Pipeline has a limitation of only 40 activity per pipeline.
Because of this limitation, managing logging framework by avoiding redundant activities and reusing the existing activities becomes a priority task.
Below are 2 scenarios wherein we are leveraging the same logic across multiple instances (same Set Variable activity / {Same logical activities}) and increasing the number of activities in a pipeline.
a) Serial Framework

b) Parallel Framework

So how can we avoid such redundant activities and still achieve the same result as expected.
Prerequisites
- MSFT Fabric Data Pipeline
Solution
MSFT Fabric Data Pipeline enables a user to take different flow paths upon outcomes of previous activities. One can branch and chain activities by creating a dependency between them and the dependency conditions.
There are four conditional paths:
- On Success
- On Failure
- On Completion
- On Skip
Those familiar with SSIS tool might link this with the SSIS Precedence Constraints but there are major differences between both as to SSIS Precedence Constraints :
a) One can have multiple constraints as a logical OR or a logical AND
b) One can add expressions to determine the flow lineage.
But in the case of MSFT Fabric Data Pipeline , all Activity dependencies map to Logical AND.
With the proper usage of ‘On Skip’ and ‘On Completion’ dependency conditions, it is possible to route failure in different points of the pipeline to the same activity which in turn reduces the need of redundant activities.
Below are the basic principles that need to be followed:
- Multiple dependencies with the same source are OR’ed together.
- Multiple dependencies with different sources are AND’ed together.
- Together this looks like
(Act_3fails OR Act_3Skipped) AND (Act_2Completes OR Act_2skipped)